Perenco UK Assets
Perenco UK operate two gas terminals located at Dimlington and Bacton. The Dimlington terminal processes natural gas condensate from Cleeton, Ravenspurn, West Sole and York offshore fields. The Bacton terminal processes natural gas condensate from the Leman, Inde and Cygus offshore fields.
​
Services Provided:
Working with Asset Engineering, Project Engineering and Operations on the following aspects:
-
Layers of Protection Analysis (LOPA) studies. Re-LOPA of Bacton Terminal
-
Support to Project Engineering to ensure all IEC61511 Safety Lifecycle Documentation is completed including: Safety Lifecycle Plan (SLP), Safety Requirements Specification (SRS), SIL Verification, Verification Checklists, Functional Safety Assessment (FSA), SIF Proof Test Procedures (PTP).
-
Overall Management of the SIF register / LOPA Scenarios through ABB SafetyInsight software.
-
Support and Lead Functional Safety Assessments
-
SIL Verification
-
Management of the FSA Tracker and closure of open items

Bacton Gas Terminal

Cleeton Offshore Platform

Ravenspurn Offshore Platform

Bacton Gas Terminal